Project Specifications


Client
Kennards

Value
$5.6 million

Location
Warrawong, New South Wales

Completion
September 2018

Design and Construction of 32 light industrial units with surrounding pavements and landscape

PROJECT DESCRIPTION

The scope of works included;

  • Installing screw piles across 2 areas in order to create a suitable platform for the building slabs
  • Pouring and lifting the tilt panels to create building A and building B shells
  • Installing the structural steel and roofing to close each building
  • Pouring concrete pavements and installing surrounding landscape

OVERCOMING CHALLENGES

The project was built over an existing 500mm deep capping layer, beneath this was highly contaminated soil that contained asbestos. Excavation works were extremely slow and difficult, all activities required asbestos monitoring and special PPE.

INNOVATIONS

Significant cost savings were made on the project by using tilt up construction rather than precast or other conventional construction methods.

Project Contact

Steve Taylor
Managing Director

Steve is a founding shareholder of lol英雄联盟积分新版v3.5(lol英雄联盟季节今日可靠) Construction. Equipped with a carpentry trade background and extensive experience with design and construct projects across all sectors of the building industry, Steve has been a driving force behind the company’s growth and success. With the appointment of a Chairman and CEO, Steve now focuses on the continual development of a successful and sustainable strategy for the business. He also plays a key role in providing leadership for the overall development of the company through strategic marketing, client relationships and procurement. Steve is based in Sydney where he has the overall management in NSW.

王者荣耀电竞 lpl外围手机版 亿博电竞最新版外围永久 lpl电竞官方观看正规 ig电子竞技(新疆)结果视频 2022lpl(长沙)抽注下载6.9.7
`